Session: 731d3ed8 — 2026-05-20

observer-sessions · Claude · branch HEAD · claude-haiku-4-5-20251001 · 2026-05-20 08:45 · 6 msgs · 19 min read · updated 12 days ago

Hello memory agent, you are continuing to observe the primary Claude session.

← observer-sessions Download .md .txt .json
Token usage227.9K total
Input110
Cache creation18.7K
Cache read201.4K
Output7.7K
Cache hit ratio91%· healthy

Project: observer-sessions · Branch: HEAD · Mode: default · Model: claude-haiku-4-5-20251001

Stats: 6 user messages, 0 tool calls, tools used: none.

Conversation

Turn 1 — User

Hello memory agent, you are continuing to observe the primary Claude session.

<observed_from_primary_session> <user_request>yes</user_request> <requested_at>2026-05-20</requested_at> </observed_from_primary_session>

You are a Claude-Mem, a specialized observer tool for creating searchable memory FOR FUTURE SESSIONS.

CRITICAL: Record what was LEARNED/BUILT/FIXED/DEPLOYED/CONFIGURED, not what you (the observer) are doing.

You do not have access to tools. All information you need is provided in <observed_from_primary_session> messages. Create observations from what you observe - no investigation needed.

Your job is to monitor a different Claude Code session happening RIGHT NOW, with the goal of creating observations and progress summaries as the work is being done LIVE by the user. You are NOT the one doing the work - you are ONLY observing and recording what is being built, fixed, deployed, or configured in the other session.

SPATIAL AWARENESS: Tool executions include the working directory (tool_cwd) to help you understand: - Which repository/project is being worked on - Where files are located relative to the project root - How to match requested paths to actual execution paths

WHAT TO RECORD

Focus on durable technical signal: - What the system NOW DOES differently (new capabilities) - What shipped to users/production (features, fixes, configs, docs) - Changes in technical domains (auth, data, UI, infra, DevOps, docs) - Concrete debugging or investigative findings from logs, traces, queue state, database rows, and code-path inspection

Use verbs like: implemented, fixed, deployed, configured, migrated, optimized, added, refactored, discovered, confirmed, traced

✅ GOOD EXAMPLES (describes what was built or learned): - "Authentication now supports OAuth2 with PKCE flow" - "Deployment pipeline runs canary releases with auto-rollback" - "Database indexes optimized for common query patterns" - "Observation queue for claude-mem session timed out waiting for an agent pool slot" - "Fallback processing abandoned pending messages after Gemini and OpenRouter returned 404"

❌ BAD EXAMPLES (describes observation process - DO NOT DO THIS): - "Analyzed authentication implementation and stored findings" - "Tracked deployment steps and logged outcomes" - "Monitored database performance and recorded metrics"

WHEN TO SKIP

Skip routine operations: - Empty status checks - Package installations with no errors - Simple file listings with no follow-on finding - Repetitive operations you've already documented - File related research that comes back empty or not found

If skipping, return an empty response only. Do not explain the skip in prose.

IMPORTANT: Continue generating observations from tool use messages using the XML structure below.

OUTPUT FORMAT

Output observations using this XML structure:

<observation> <type>[ bugfix | feature | refactor | change | discovery | decision | security_alert | security_note ]</type>

<title>[title: Short title capturing the core action or topic]</title> <subtitle>[subtitle: One sentence explanation (max 24 words)]</subtitle> <facts> <fact>[Concise, self-contained statement]</fact> <fact>[Concise, self-contained statement]</fact> <fact>[Concise, self-contained statement]</fact> </facts> <!-- facts: Concise, self-contained statements Each fact is ONE piece of information No pronouns - each fact must stand alone Include specific details: filenames, functions, values

files: All files touched ( …(truncated, 1807 more chars)

Turn 2 — User

--- MODE SWITCH: PROGRESS SUMMARY --- ⚠️ CRITICAL TAG REQUIREMENT — READ CAREFULLY: • You MUST wrap your ENTIRE response in <summary>...</summary> tags. • Do NOT use <observation> tags. <observation> output will be DISCARDED and cause a system error. • The ONLY accepted root tag is <summary>. Any other root tag is a protocol violation.

PROGRESS SUMMARY CHECKPOINT

Write progress notes of what was done, what was learned, and what's next. This is a checkpoint to capture progress so far. The session is ongoing - you may receive more requests and tool executions after this summary. Write "next_steps" as the current trajectory of work (what's actively being worked on or coming up next), not as post-session future work. Always write at least a minimal summary explaining current progress, even if work is still in early stages, so that users see a summary output tied to each request.

Claude's Full Response to User: Question 3 of N

The plan's Step 2 says to rename the stale funnelId acceptance describe block — but only mentions tiEnvProvider.test.ts. The actual idpAuthenticator.test.ts has the same stale pattern at line 273:

// idpAuthenticator.test.ts line 273 — NOT in the plan's Step 2
describe('funnelId acceptance', () => {
  it('passes funnelId as traceId down to the logger if funnelId is passed', async () => {

My recommendation: rename it to traceId acceptance / passes traceId down when provided for the same consistency reason — both tests were introduced together for FHIR-2102 and should be updated together. It's a two-line change that keeps the test suite coherent with the source code rename.

Should we add the idpAuthenticator.test.ts funnelId acceptance rename to Step 2's scope? (Recommended: yes)

Respond in this XML format: <summary> <request>[Short title capturing the user's request AND the substance of what was discussed/done]</request> <investigated>[What has been explored so far? What was examined?]</investigated> <learned>[What have you learned about how things work?]</learned> <completed>[What work has been completed so far? What has shipped or changed?]</completed> <next_steps>[What are you actively working on or planning to work on next in this session?]</next_steps> <notes>[Additional insights or observations about the current progress]</notes> </summary>

REMINDER: Your response MUST use <summary> as the root tag, NOT <observation>. IMPORTANT! DO NOT do any work right now other than generating this next PROGRESS SUMMARY - and remember that you are a memory agent designed to summarize a DIFFERENT claude code session, not this one.

Never reference yourself or your own actions. Do not output anything other than the summary content formatted in the XML structure above. All other output is ignored by the system, and the system has been designed to be smart about token usage. Please spend your tokens wisely on useful summary content.

Thank you, this summary will be very useful for keeping track of our progress!

Turn 2 — Assistant

<summary> <request>Review and decide whether to expand Step 2's scope to include renaming stale funnelId acceptance describe blocks in both test files instead of just tiEnvProvider.test.ts</request> <investigated>Examined plan Step 2 which specifies renaming funnelId acceptance in tiEnvProvider.test.ts; discovered that idpAuthenticator.test.ts has an identical stale naming pattern at line 273 with the same describe block and test structure</investigated> <learned>Both test files were introduced together for the same JIRA ticket (FHIR-2102) and contain parallel implementations of the same pattern; renaming should be consistent across both files to maintain coherence with the source code refactoring</learned> <completed>Analysis of test file naming consistency; identified that the existing plan is incomplete and misses a matching pattern that should be updated for consistency</completed> <next_steps>Decision checkpoint: confirm whether Step 2 scope should expand to include idpAuthenticator.test.ts (line 273) in addition to tiEnvProvider.test.ts; then proceed with dual renaming of both funnelId acceptance blocks to traceId acceptance / passes traceId down when provided</next_steps> <notes>The recommendation to expand scope is strong because: (1) both files were introduced together, (2) the change is minimal (two lines per file), (3) keeping them synchronized maintains test suite coherence with the codebase refactoring, and (4) leaving one unchanged would create maintenance debt and confusion</notes> </summary>

Turn 3 — User

--- MODE SWITCH: PROGRESS SUMMARY --- ⚠️ CRITICAL TAG REQUIREMENT — READ CAREFULLY: • You MUST wrap your ENTIRE response in <summary>...</summary> tags. • Do NOT use <observation> tags. <observation> output will be DISCARDED and cause a system error. • The ONLY accepted root tag is <summary>. Any other root tag is a protocol violation.

PROGRESS SUMMARY CHECKPOINT

Write progress notes of what was done, what was learned, and what's next. This is a checkpoint to capture progress so far. The session is ongoing - you may receive more requests and tool executions after this summary. Write "next_steps" as the current trajectory of work (what's actively being worked on or coming up next), not as post-session future work. Always write at least a minimal summary explaining current progress, even if work is still in early stages, so that users see a summary output tied to each request.

Claude's Full Response to User: Question 4 of N

There's a convention mismatch between the implementation plan and your instructions:

  • Plan says: fix(FHIR-2120): propagate traceId to TiEnvProvider.getEnv across specialist service
  • Your instructions say: PR title prefix chore(fhir-2120):

Semantically, this change is a fix — the traceId was available but not forwarded, causing every TiEnvProvider log line to emit 'unknown' instead of the real trace context. That's a defect in log correlation, which matches fix. chore typically means maintenance work with no behavior change.

My recommendation: use fix(FHIR-2120) — it accurately describes what we're doing and will make the PR easier to understand during code review and release note generation.

Do you want to override the plan's fix prefix with chore as specified in your instructions, or keep fix? (Recommended: keep fix)

Respond in this XML format: <summary> <request>[Short title capturing the user's request AND the substance of what was discussed/done]</request> <investigated>[What has been explored so far? What was examined?]</investigated> <learned>[What have you learned about how things work?]</learned> <completed>[What work has been completed so far? What has shipped or changed?]</completed> <next_steps>[What are you actively working on or planning to work on next in this session?]</next_steps> <notes>[Additional insights or observations about the current progress]</notes> </summary>

REMINDER: Your response MUST use <summary> as the root tag, NOT <observation>. IMPORTANT! DO NOT do any work right now other than generating this next PROGRESS SUMMARY - and remember that you are a memory agent designed to summarize a DIFFERENT claude code session, not this one.

Never reference yourself or your own actions. Do not output anything other than the summary content formatted in the XML structure above. All other output is ignored by the system, and the system has been designed to be smart about token usage. Please spend your tokens wisely on useful summary content.

Thank you, this summary will be very useful for keeping track of our progress!

Turn 3 — Assistant

<summary> <request>Resolve convention mismatch between implementation plan's fix(FHIR-2120) prefix and instructions that specify chore(fhir-2120): for PR title</request> <investigated>Examined commit message conventions; compared semantic intent of plan (fix prefix) against instructions (chore prefix); analyzed whether this change constitutes a fix or chore based on actual behavior change</investigated> <learned>traceId propagation to TiEnvProvider.getEnv is a behavioral fix, not maintenance: it corrects a defect where logs emit 'unknown' instead of actual trace context, which impairs log correlation; fix prefix accurately describes this defect correction, while chore is reserved for maintenance without behavior changes</learned> <completed>Semantic analysis of commit conventions and change classification; identified that plan's fix(FHIR-2120) is more accurate than instructions' chore(fhir-2120) for this specific change</completed> <next_steps>Pending decision: confirm whether to use fix(FHIR-2120) (aligns with plan semantics) or override with chore(fhir-2120) (per instructions); once resolved, proceed with test renaming (both tiEnvProvider.test.ts and idpAuthenticator.test.ts), implementation changes, and PR creation</next_steps> <notes>Strong recommendation to use fix because it improves code review clarity, makes release notes more accurate for stakeholders, and correctly reflects that log correlation is now functioning properly—a behavioral improvement, not pure maintenance</notes> </summary>

Turn 4 — User

--- MODE SWITCH: PROGRESS SUMMARY --- ⚠️ CRITICAL TAG REQUIREMENT — READ CAREFULLY: • You MUST wrap your ENTIRE response in <summary>...</summary> tags. • Do NOT use <observation> tags. <observation> output will be DISCARDED and cause a system error. • The ONLY accepted root tag is <summary>. Any other root tag is a protocol violation.

PROGRESS SUMMARY CHECKPOINT

Write progress notes of what was done, what was learned, and what's next. This is a checkpoint to capture progress so far. The session is ongoing - you may receive more requests and tool executions after this summary. Write "next_steps" as the current trajectory of work (what's actively being worked on or coming up next), not as post-session future work. Always write at least a minimal summary explaining current progress, even if work is still in early stages, so that users see a summary output tied to each request.

Claude's Full Response to User: Question 5 of N

The plan explicitly removes the FHIR-2102 comment block from tiEnvProvider.ts (lines 38–39 and 83–84) because "the param is no longer temporary in name." However, idpAuthenticator.ts has the same comment pattern on two methods (lines 24–25 and 60–61):

// https://doctolib.atlassian.net/browse/FHIR-2102
// Temporarily accepts traceId before loggers are refactored
static async authenticateWithTiIdp(...)

These are subtly different from the tiEnvProvider comment. The tiEnvProvider comment justified a parameter rename (funnelId was the "temporary" name). The idpAuthenticator comments justify a logging architecture that is still not resolved — FHIR-2102 (the full logger refactor) is a separate open ticket.

My recommendation: leave the FHIR-2102 comments in idpAuthenticator.ts untouched — they track future work in a separate issue, they're still accurate, and removing them without completing FHIR-2102 loses the tracking context. Only the tiEnvProvider comment gets removed (as the plan says) because that one was specifically about the parameter name being temporary.

Do you agree the idpAuthenticator.ts FHIR-2102 comments should be left as-is? (Recommended: yes — they belong to a separate ticket)

Respond in this XML format: <summary> <request>[Short title capturing the user's request AND the substance of what was discussed/done]</request> <investigated>[What has been explored so far? What was examined?]</investigated> <learned>[What have you learned about how things work?]</learned> <completed>[What work has been completed so far? What has shipped or changed?]</completed> <next_steps>[What are you actively working on or planning to work on next in this session?]</next_steps> <notes>[Additional insights or observations about the current progress]</notes> </summary>

REMINDER: Your response MUST use <summary> as the root tag, NOT <observation>. IMPORTANT! DO NOT do any work right now other than generating this next PROGRESS SUMMARY - and remember that you are a memory agent designed to summarize a DIFFERENT claude code session, not this one.

Never reference yourself or your own actions. Do not output anything other than the summary content formatted in the XML structure above. All other output is ignored by the system, and the system has been designed to be smart about token usage. Please spend your tokens wisely on useful summary content.

Thank you, this summary will be very useful for keeping track of our progress!

Turn 4 — Assistant

<summary> <request>Determine scope of FHIR-2102 comment removal: clarify whether comments should be removed from both tiEnvProvider.ts and idpAuthenticator.ts, or only from tiEnvProvider.ts</request> <investigated>Examined comment block pattern across both files; analyzed semantic purpose of FHIR-2102 comments in tiEnvProvider.ts (lines 38-39, 83-84) versus idpAuthenticator.ts (lines 24-25, 60-61); traced which comments track completed work versus open issues</investigated> <learned>tiEnvProvider FHIR-2102 comments justified a temporary parameter name that is now permanent; idpAuthenticator FHIR-2102 comments justify a logging architecture refactor that remains open and unresolved; same ticket number, different contexts and lifecycles</learned> <completed>Analysis of comment semantics and ticket tracking relationships across files; determined that comments serve different purposes despite shared FHIR-2102 reference</completed> <next_steps>Pending confirmation: remove FHIR-2102 comments only from tiEnvProvider.ts (as planned), preserve comments in idpAuthenticator.ts; once approved, proceed with renaming test blocks in both files, implementing traceId propagation changes, and creating PR</next_steps> <notes>Recommendation to preserve idpAuthenticator comments is strong because: (1) they track separate future work in an open ticket, (2) removing them without completing FHIR-2102 logging refactor loses critical tracking context, (3) they remain technically accurate and valuable for future maintainers, (4) separating the concerns keeps the scope of this fix clean and bounded</notes> </summary>

Turn 5 — User

--- MODE SWITCH: PROGRESS SUMMARY --- ⚠️ CRITICAL TAG REQUIREMENT — READ CAREFULLY: • You MUST wrap your ENTIRE response in <summary>...</summary> tags. • Do NOT use <observation> tags. <observation> output will be DISCARDED and cause a system error. • The ONLY accepted root tag is <summary>. Any other root tag is a protocol violation.

PROGRESS SUMMARY CHECKPOINT

Write progress notes of what was done, what was learned, and what's next. This is a checkpoint to capture progress so far. The session is ongoing - you may receive more requests and tool executions after this summary. Write "next_steps" as the current trajectory of work (what's actively being worked on or coming up next), not as post-session future work. Always write at least a minimal summary explaining current progress, even if work is still in early stages, so that users see a summary output tied to each request.

Claude's Full Response to User: Question 6 of N

Your instructions require a TDD approach, but the plan's order is implementation-first (Steps 1–9 source changes, then Step 10 test updates). For parameter-threading changes, TDD means: write a failing assertion that traceId was forwarded → run test → watch it fail → add the parameter → watch it pass.

The practical bottom-up TDD ordering for this ticket would be:

1. tiEnvProvider: rename describe/it blocks (no red/green needed — cosmetic)
2. IdpChallengeService: write failing test (tiEnvProviderSpy called with traceId),
   then add traceId? to getTiEnvValues/getIdpClient/getDiscoveryDocument/fetchChallengeWithConsent
3. ChallengeValidator: write failing test (fetchChallengeWithConsent called with traceId),
   then add traceId? to validateAndGetChallenge + fetchNewChallengeAndCache
4. idpAuthenticator: write failing assertion (validateAndGetChallenge called with traceId),
   then forward at the 4 call sites
5. VauClient: write failing test (tiEnvProviderSpy called with traceId),
   then add traceId? to fetchEncryptionCertificate/post
6. VauService: write failing assertion (VauClient spies called with traceId),
   then add traceId? to fetchValidEncryptionKey/prepareAndExecutePostRequest
7. gematikERezeptService + listeners: write failing assertions, then forward at call sites

Each unit only propagates one level at a time, keeping the red→green cycles tight.

My recommendation: follow this bottom-up TDD ordering instead of the plan's implementation-first ordering. It also naturally ensures each layer compiles and tests pass before moving to the next.

Do you agree to use this bottom-up TDD ordering during implementation? (Recommended: yes)

Respond in this XML format: <summary> <request>[Short title capturing the user's request AND the substance of what was discussed/done]</request> <investigated>[What has been explored so far? What was examined?]</investigated> <learned>[What have you learned about how things work?]</learned> <completed>[What work has been completed so far? What has shipped or changed?]</completed> <next_steps>[What are you actively working on or planning to work on next in this session?]</next_steps> <notes>[Additional insights or observations about the current progress]</notes> </summary>

REMINDER: Your response MUST use <summary> as the root tag, NOT <observation>. IMPORTANT! DO NOT do any work right now other than generating this next PROGRESS SUMMARY - and remember that you are a memory agent designed to summarize a DIFFERENT claude code session, not this one.

Never reference yourself or your own actions. Do not output anything other than the summary content formatted in the XML structure above. All other output is ignored by the system, and the system has been designed to be smart about token usage. Please spend your tokens wisely on useful summary content.

Thank you, this summary will be very useful for keeping track of our progress!

Turn 5 — Assistant

<summary> <request>Resolve methodology mismatch: validate whether to follow user's TDD instructions or plan's implementation-first ordering for propagating traceId across the specialist service stack</request> <investigated>Compared user instructions (TDD: write failing test → implement → watch pass) against plan's execution order (Steps 1-9 source changes, Step 10 tests); analyzed whether plan supports tight red-green-refactor cycles</investigated> <learned>Plan's implementation-first ordering creates long feedback loops: all source changes batched together, test verification deferred to end; bottom-up TDD ordering with per-layer test-first approach ensures: (1) tight red-green cycles, (2) early compilation verification at each layer, (3) confidence that each component correctly forwards traceId before building on it</learned> <completed>Analysis of test-driven development methodology alignment; designed alternative bottom-up TDD ordering covering 7 implementation phases: test renaming → IdpChallengeService (test/impl) → ChallengeValidator (test/impl) → idpAuthenticator (test/impl) → VauClient (test/impl) → VauService (test/impl) → gematikERezeptService + listeners (test/impl)</completed> <next_steps>Pending confirmation: adopt bottom-up TDD ordering for implementation; once approved, begin Phase 1 (test renaming), then move through Phases 2-7 with write-failing-test → implement-single-layer → verify-pass pattern</next_steps> <notes>Bottom-up TDD ordering advantages: (1) aligns with user's stated TDD methodology, (2) catches integration bugs earlier per-layer, (3) reduces batch-testing risk of large implementation-first approach, (4) naturally ensures each layer compiles and passes before dependent layer begins, (5) provides clear stopping point if issues surface at any layer</notes> </summary>

Turn 6 — User

--- MODE SWITCH: PROGRESS SUMMARY --- ⚠️ CRITICAL TAG REQUIREMENT — READ CAREFULLY: • You MUST wrap your ENTIRE response in <summary>...</summary> tags. • Do NOT use <observation> tags. <observation> output will be DISCARDED and cause a system error. • The ONLY accepted root tag is <summary>. Any other root tag is a protocol violation.

PROGRESS SUMMARY CHECKPOINT

Write progress notes of what was done, what was learned, and what's next. This is a checkpoint to capture progress so far. The session is ongoing - you may receive more requests and tool executions after this summary. Write "next_steps" as the current trajectory of work (what's actively being worked on or coming up next), not as post-session future work. Always write at least a minimal summary explaining current progress, even if work is still in early stages, so that users see a summary output tied to each request.

Claude's Full Response to User: Question 7 of N

Adding traceId? as the last positional parameter to ChallengeValidator.validateAndGetChallenge creates this signature:

static async validateAndGetChallenge(
  configurationService: ConfigurationService,
  service: TiService,
  smcbIccsn: string,
  savedConsent?: UserConsent,
  scope?: string,
  traceId?: string,   // ← new, last
): Promise<ChallengeValidationResult>

Since savedConsent?, scope?, and traceId? are all optional, a caller that wants to pass traceId but skip scope must write validateAndGetChallenge(config, service, iccsn, consent, undefined, traceId). This could be cleaned up with an options object, but that would be a larger refactor touching every call site and every other method in the chain — well beyond FHIR-2120's scope.

The alternative — inserting traceId? between service and smcbIccsn, or between two required params — would break every existing call site and is not backward-compatible.

My recommendation: keep traceId? as the last positional parameter — it's consistent with the pattern used in every other method in this chain (IdpChallengeService, VauService, VauClient), and the options-object refactor belongs to FHIR-2102 (the full logger refactor), not here.

Do you agree traceId? should be the last positional parameter throughout the chain? (Recommended: yes)

Respond in this XML format: <summary> <request>[Short title capturing the user's request AND the substance of what was discussed/done]</request> <investigated>[What has been explored so far? What was examined?]</investigated> <learned>[What have you learned about how things work?]</learned> <completed>[What work has been completed so far? What has shipped or changed?]</completed> <next_steps>[What are you actively working on or planning to work on next in this session?]</next_steps> <notes>[Additional insights or observations about the current progress]</notes> </summary>

REMINDER: Your response MUST use <summary> as the root tag, NOT <observation>. IMPORTANT! DO NOT do any work right now other than generating this next PROGRESS SUMMARY - and remember that you are a memory agent designed to summarize a DIFFERENT claude code session, not this one.

Never reference yourself or your own actions. Do not output anything other than the summary content formatted in the XML structure above. All other output is ignored by the system, and the system has been designed to be smart about token usage. Please spend your tokens wisely on useful summary content.

Thank you, this summary will be very useful for keeping track of our progress!

Turn 6 — Assistant

<summary> <request>Decide on parameter placement strategy for adding traceId? to method signatures across the service chain during implementation</request> <investigated>Analyzed three approaches for adding traceId? to ChallengeValidator.validateAndGetChallenge and related methods: (1) last positional parameter, (2) insert between required params, (3) options object refactor; examined call site impact and backward-compatibility constraints</investigated> <learned>Last positional parameter is consistent with existing pattern in IdpChallengeService, VauService, and VauClient methods; options object would require refactoring every call site in the chain (beyond FHIR-2120 scope); inserting between required params breaks backward compatibility; tradeoff between optional parameter ergonomics (undefined placeholders) and scope management (keep refactors bounded)</learned> <completed>Analysis of parameter placement tradeoffs and scope boundary clarification; confirmed that last positional parameter placement aligns with established pattern across the stack</completed> <next_steps>Proceed with implementation using traceId? as last positional parameter throughout the chain; continue bottom-up TDD phases for IdpChallengeService, ChallengeValidator, idpAuthenticator, VauClient, VauService, and gematikERezeptService + listeners</next_steps> <notes>Decision rationale: consistency across the chain outweighs parameter ergonomics; options object refactoring appropriately belongs to FHIR-2102 (full logger architecture refactor), not FHIR-2120 (focused traceId propagation); explicit undefined placeholders are acceptable cost for maintaining scope boundaries and backward compatibility</notes> </summary>

Keyboard shortcuts

⌘K / Ctrl+KOpen command palette
/Focus search
g hGo to home
g pGo to projects
g sGo to sessions
j / kNext / prev row (tables)
?Show this help
EscClose dialogs

Structured queries

Mix key:value filters with free text in the palette:

type:sessionOnly session pages
project:llm-wikiFilter by project name (substring)
model:claudeFilter by model name (substring)
date:>2026-03-01Sessions after a date
date:<2026-04-01Sessions before a date
tags:rustPages mentioning a tag/topic
sort:dateSort results by date (newest first)

Example: type:session project:llm-wiki date:>2026-04 sort:date